CONSTRUCTION BUDGET MODEL
Client: — | 5-Year Forecast
STATIC BASELINE LOCKED LIVE ROLLING FORECAST ACTIVE Updates when actuals or pipeline overrides differ from baseline
📊 Budget vs Actual — Year to Date (Year 1)
🤝 Contracts Signed — Target vs Actual
Contract Lifecycle — Lead Time Visualiser
Contracts signed today won't generate revenue until Month 8 (after 7 months of pre-construction). Claims are issued per your installment schedule — watch the Cash Flow tab for the timing impact.
Two-Track Model: The Static Baseline (Budget) uses Budget Contracts/Month and Budget Lead Time — these are locked and never change once set. The Live Rolling Forecast uses Rolling Forecast Contracts/Month, the live Lead Time slider, and any pipeline overrides you enter in the Pipeline tab. The Dashboard Budget vs Actual panel always compares actuals against the locked baseline.
📅 Modelling Period
Mo
Yr
Yr
📈 Annual Growth (Indexation)
%
%
📋 Contract & Revenue
$
$
📊 Claim Installment Schedule
Define when progress claims are invoiced during the on-site phase. Percentages represent % of total contract value claimed each month on site. Total should equal 100%.
Month On-Site Claim % of Contract Value
Total Claims: 100.0%
Lead Time & Project Timeline
7
7
$
💼 Sales Commission
Commission is payable at the first month on-site. Choose between % of total contract value or a fixed dollar amount per contract.
%
💰 Cost of Sales (% of Revenue)
%
%
%
%
%
%
🏢 Monthly Fixed Overheads
$
👷 Payroll Settings
%
%
🛡 WorkCover & Payroll Tax
WorkCover: Applied to total wages & super each month. SA construction industry rate is typically 1.5–2.5%.
SA Payroll Tax: 4.95% on annual wages above the SA threshold ($1.5M). Paid monthly on estimated basis.
%
%
$
🏗 Capital Spending
Annual capital expenditure (plant, equipment, vehicles, leasehold improvements). Spread evenly across each year's 12 months in the Cash Flow. Does not affect P&L.
$
$
$
$
$
⚖️ Tax & Other
%
%
Monthly Override: Leave blank to use default assumptions. Revenue for contracts signed in Month 1 starts flowing in Month 8 (after 7 months lead time) per your claim installment schedule.
📊 Monthly Contract Pipeline — 60 Months
Month Contracts Signed Avg Value ($) Contract Value ($) Deposit Received ($) Lead Time (mths) Onsite Month 1st Claim ($)
📈 Pipeline by Year
Opening Jobs = jobs already on hand. Enter how many go on-site each month and the per-job value; these bill immediately (no lead time).
Opening Balances = carried-in receivables/payables/GST position at the budget start. Debtors and creditors show up as one-off cash movements in the FIRST budget month (debtors in, creditors out); GST debt shows up as a cash outflow at the first lodgement settlement month (negative = refund, an inflow).
💰 Opening Balances
$
$
$
🏗️ Opening Jobs on Hand
Start month (0 = first budget month; negatives = started before) Jobs Contract value each ($)
👥 Staff Positions & Payroll
Super: Rate set in Assumptions (currently 12%) added on top of base salary. Annual wage inflation applied year-over-year. WorkCover & Payroll Tax are calculated automatically from totals.
Role / Name Department Annual Salary ($) Start Month Monthly Cost (est.)
TOTAL $0 0 positions $0
No actuals loaded
📥
Drop CSV or Excel file here, or click to browse
Template columns: Month, Contracts Signed (#), Revenue, Cost of Sales, Payroll & Super, WorkCover, Payroll Tax, Commission, one column per overhead item, Cash Receipts, Total Cash Paid, Closing Cash Balance. Download the template to see the exact overhead columns.
📊 Actual Figures — Monthly Entry
After entering actuals, switch to the P&L or Cash Flow tab and select Actual or Variance (A−B) to compare against the forecast.
Variance = Actual minus Budget. Green = favourable · Red = unfavourable.
View:
📉 Profit & Loss Statement
View:
💵 Cash Flow Forecast
Payroll timing: Wages paid fortnightly (26 runs/yr). Super: Paid quarterly (Oct/Jan/Apr/Jul). Supplier payments: COS paid per supplier payment cycle. Commission: Paid at first month on-site per contract. Deposits: Received at contract signing.